Azerbaijan reveals when Fuzuli International Airport to be commissioned
The international airport in Azerbaijan’s Fuzuli city liberated from the Armenian occupation is planned to be commissioned till late September 2021, AZAL Vice President Etibar Huseynov said.
"The total length of the airport will reach 4.8 kilometers, of which three kilometers are the runway and 900 meters - the lighting zone," AZAL vice president added.
"Today, along with the construction of the airport, the work is underway to install navigation and other equipment," Huseynov said.
"The Victory Road highway will have the access to this airport," AZAL vice president said. "Moreover, construction of the airport in Zangilan district has begun and construction is planned to be launched in Lachin district."
Huseynov stressed that one terminal will operate by the time of commissioning the airport, Trend reported.


The US and the Transport Corridor Through Armenia: A New Geopolitical Chess Game in the South Caucasus
16.Jul.2025
Azerbaijan Initially Advocated for Direct Negotiations Without Mediators – Expert
15.Jul.2025
A Turning Point for the South Caucasus: Pashinyan and Aliyev Prepare for Critical Talks in Abu Dhabi
10.Jul.2025
The War Without an Exit: Russia's Stalemate in Ukraine
09.Jul.2025
President of Armenia Vahagn Khachaturyan: “We need peace — this is a new chapter in history”
08.Jul.2025
An Alliance Without Illusions: Why Russia Needs Azerbaijan
07.Jul.2025
Russia’s Economy Slips into Stagnation — Recession on the Horizon
05.Jul.2025
Massive Attack on Ukraine Follows Putin–Trump Call
04.Jul.2025
Georgian Parliament Strips Mandates from 12 MPs of Gakharia’s Party and Suspends Its Funding
02.Jul.2025
Scorched Earth Tactics: Why Is Russia Attacking Huliaipole?
02.Jul.2025